Commencing 1 May 2020, Taranaki Solar Power warranties that your system will perform to a minimum kilowatt production for a period of 5 years from commissioning.

If your system does not produce X† amount of kwh (kilowatt hours) Taranaki Solar Power will credit the difference based on your cost per kwh from your power company.

 †Based on individual system design and will be disclosed at time of design.

*Must be designed by, or signed off by Taranaki Solar Power
*Qualifying inverter systems only
*Requires monitoring application
*Based on annual production from anniversary of installation.
*Not transferable
*Not applicable at any time whilst system may be under repair or shut down
*Only applies to grid-tied installations i.e. not applicable to off-grid installs

Top